Render & Cladding Scaffolding
Render and cladding need a different scaffold to roofing. The platform has to run the full elevation at multiple lifts, sit close enough to the wall to work comfortably but far enough out to fit insulation boards and beads, and come with tie positions planned so the finished surface is not covered in patch marks.
We plan tie locations with your renderer or EWI installer before we start, using window ties, box ties or through-ties depending on the substrate, and we agree the order in which they get removed and made good at the end. On external wall insulation work we set the scaffold out to allow for board thickness plus render depth plus working space, so nobody is scraping knuckles at 6 metres.
Multiple boarded lifts at 1.8 to 2 metre centres let a team work a whole elevation at once instead of leapfrogging. Where the finish is weather-sensitive we can sheet the scaffold in monoflex or install a temporary roof so silicone and mineral renders cure properly through a Sussex winter.
Projects range from single-storey extensions in Bexhill to full block re-clads in Brighton and Medway. Every scaffold is TG20:21 compliant or bespoke designed, CISRS erected, weekly inspected and handed over with certification your main contractor can file.
Why book us for this
- Multiple boarded lifts so a full elevation can be worked at once
- Standoff distance set for insulation board plus render depth
- Tie positions planned and agreed before erection
- Monoflex sheeting and temporary roofs for weather-sensitive finishes
- Phased strike and make-good at the end of the job
- Full inspection records for main contractor files
How it works
- 1Spec reviewWe take your render or cladding build-up and set the standoff accordingly.
- 2Fixed quoteWritten price including sheeting, ties and phased strike.
- 3ErectLifts boarded out and handed over elevation by elevation if needed.
- 4During worksWeekly inspections, adjustments and tie changes as the finish progresses.
- 5StrikePhased dismantle so final coats and tie holes can be made good.
Gallery
Frequently asked
How far from the wall should a render scaffold sit?
Far enough for the full build-up plus working space, typically 300mm to 450mm for standard render and more for external wall insulation. We set it from your specification.
Can you sheet the scaffold?
Yes. Monoflex sheeting or a temporary roof keeps rain and wind off freshly applied render and extends your working season.
What happens to the tie holes?
We agree tie positions up front and strike in phases so your renderer can make good each hole as the scaffold comes down.
Do you work for main contractors?
Regularly. We supply full RAMS, TG20 or bespoke design paperwork and weekly inspection records.